![]() The Michigan Department of Environment, Great Lakes and Energy (EGLE) previously permitted both projects for material placement before the contracts were awarded. Material from the dredging will be placed near the shore between 800-3,300 feet north of the north pier. Under the conditions of the contract, the project can start Aug. ![]() Additional funding from the Work Plan in the 2023 Civil Works Budget added additional funding to increase the total award to $440,662. The project contract, awarded March 30, for $299,025. of Holland, Michigan, will remove 59,081 cubic yards of material from the navigation channel near the pierheads upstream to Pentwater Lake. The contract requires the work to be completed by Sept. Viking Marine, as a subcontractor, has already begun dredging and placement. The contract was increased to $833,231 for the additional work. The $684,001 contract was initially awarded May 11, but additional surveys showed more shoaling in the area. ![]() ![]() The material will be used to nourish the shore about 5,500 feet south of the south breakwater for 3,500 feet southward. Marie, Michigan-based MCM Marine, Inc., will dredge 81,323 cubic yards from the federal navigation channel lakeward of the breakwater heads and east to South Ferry Street. The projects represent about $1.25 million in dredging to keep the federal navigation system safe and open for commercial and recreational traffic. Army Corps of Engineers, Detroit District (USACE) will begin dredging operations in Ludington and Pentwater harbors on Lake Michigan on Friday, Aug. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |